Secondary Complex


Lansing, Michigan

Project Responsibilities For Matrix


  • Electrical Engineering

    • Lighting systems upgrade

    • Data wiring

    • New server room

    • Reconfiguring of power distribution

  • Mechanical Engineering

    • Upgrade of HVAC systems

    • Plumbing renovations

    • Expansion of Building Automation Systems

  • Commissioning

    • Commissioning of new and existing HVAC & lighting systems

The project consisted of upgrading the mechanical and electrical infrastructure for the three-story 255,000 square foot building.  

The HVAC system consisted of replacing and rezoning 175,000 square feet of office space with new VAV boxes to match the new floor layout.  

The heating system central equipment was completely replaced, control valves were replaced in both the heating and chilled water systems and new air handlers were installed.  

The HVAC system was also installed to eliminate the pressure problems that were occurring in the building.  Matrix responsibilities also included plumbing, fire protection, lighting, power, fire alarm, and data.